VALVES, FITTINGS & FIRE WATER SOLUTIONSinfo@devinsan.com

Control valves / DCT23

Flow Control Valve

The flow control valve model. Share target flow, available pressure conditions and the control scenario for product review.

Model code
DCT23
Product family
Control valves
DEVINSAN / DCT SERIESDevinsan DCT23 Flow Control Valve
DCT23PRODUCT IMAGE

01 / MODEL SELECTION

The right configuration
starts with your project.

Control valve options for pressure, level, flow and operating requirements, plus alarm and fire-system valve groups. Start with your control scenario to explore relevant models.

Size, pressure class and material configuration are confirmed against the current technical datasheet. Share your operating conditions to request a review for this model.

LET’S DEFINE THE REQUIREMENTS

  • 01Control scenario
  • 02Inlet / outlet conditions
  • 03Pilot & operating requirements
INCLUDE IN YOUR ENQUIRY

Quantity, fluid, operating conditions and destination. Include a specification and product list where available.

Catalogue data / DCT23

Technical specifications

Nominal size
DN 40–200
Nominal pressure
PN 10 / 16

DN / PN combinations

DNPN
40, 50, 65, 80, 100, 150, 20010 / 16

The table lists the catalogue sizes and pressure designations. Confirm the fluid, temperature, connections and selected materials with your enquiry.

Components and materials

ComponentMaterial / options
BodyEN-GJS-400-15 (GGG40)
BonnetEN-GJS-400-15 (GGG40)

Material alternatives are catalogue options, not a statement that every configuration suits every application.

Request the current dimensional drawing for installation dimensions, weights and the final configuration.

Open catalogue · English PDF

English PDF · Web revision 9 November 2026. Confirmed corrections and fields awaiting confirmation are identified in the PDF. Request the current drawing for your selected configuration.

02 / TECHNICAL DOCUMENTS

Access information.
Confirm the details.

Review the model datasheet or request drawings and the document scope required for your project.

01Product catalogueOpen PDF catalogue in Google Drive · New tab

DCT23 / FOR YOUR PROJECT

Let’s define your requirements together.

DEVINSAN / PROJECT ENQUIRY

Tell us about your project.

Share your requirements and supporting documents. Our team will review your enquiry.

Your details are used to assess and respond to your enquiry. Form records and uploaded files are scheduled for deletion after 180 days.

DEVINSAN / PRODUCTION

Actual footage from Devinsan’s production process.