VALVES, FITTINGS & FIRE WATER SOLUTIONSinfo@devinsan.com ↗

DEVINSAN / APPLICATIONS

Understand the pipeline.
Then select the product.

Every pipeline operates differently. Start with your application when selecting products for water supply, wastewater, irrigation or fire water projects.

Explore the complete product range

Related product families are a starting point. Final selection is confirmed against the model, configuration and project requirements.

01

Water supply & distribution

TRANSMISSION / DISTRIBUTION NETWORKS

From the source.
Through the network.

Product selection for water transmission and distribution starts with the fluid, pressure, pipeline geometry and operating conditions. Review isolation and air management needs in the context of the whole project.

TECHNICAL REVIEW

Conditions that shape the selection.

  1. 01

    Contact with the fluid

    Required materials and document scope for the body, coating and sealing components.

  2. 02

    Operating conditions

    Operating pressure, temperature, flow rate and pump operating pattern.

  3. 03

    Installation & operation

    Pipe size, flange standard, installation location and manual or actuated operation.

02

Wastewater & treatment

TREATMENT PLANTS / PUMPING STATIONS

Understand the fluid.
Define the selection.

Wastewater composition directly affects the review of product design and materials. Share the solids content, fibrous material and maintenance conditions to assess the model options together.

TECHNICAL REVIEW

Conditions that shape the selection.

  1. 01

    Fluid composition

    Solids and fibrous content, chemical properties and abrasive particles.

  2. 02

    Pipeline arrangement

    Flow direction, pump layout, operating pressure and installation position.

  3. 03

    Maintenance access

    Space available for cleaning, component replacement and pipeline isolation.

03

Irrigation & agriculture

AGRICULTURAL IRRIGATION / PIPELINE CONNECTIONS

Bring field conditions
into the pipeline design.

Irrigation projects require a joint review of the water source, elevation changes and operating pattern. Define isolation, air management and connection needs around your project information.

TECHNICAL REVIEW

Conditions that shape the selection.

  1. 01

    Source & pipeline

    Water source, suspended particles, pipeline route and elevation data.

  2. 02

    Operating pattern

    Required flow rate, pressure zones, pump operation and opening/closing pattern.

  3. 03

    Site connections

    Pipe material, connection dimensions and service access.

04

Fire water

HYDRANT LINES / FIRE WATER NETWORKS

Start with
the project specification.

Hydrants, isolation valves and alarm valve groups are selected around the project specification, installation conditions and required documentation. Confirm the product and configuration at model level.

TECHNICAL REVIEW

Conditions that shape the selection.

  1. 01

    Specification & documents

    Standards, approvals and product-level document scope required by the project.

  2. 02

    Layout & connection

    Above-ground or underground installation, connection standard and access conditions.

  3. 03

    System information

    Design pressure, pipe dimensions and the operating/monitoring requirements defined in the project.

YOUR NEXT STEP

Let’s review your project.
With the details that matter.

Share the information you have and clarify the remaining details with our technical team. You can email your specification and product list.

  1. 01

    Fluid & application

    Fluid type, composition and application.

  2. 02

    Size & pressure

    DN, PN and project operating conditions.

  3. 03

    Temperature & materials

    Temperature range and required materials.

  4. 04

    Connections & operation

    Connection standard, installation and actuation type.

  5. 05

    Specification & drawings

    Product list, drawings and required document scope.

  6. 06

    Quantity & delivery

    Quantity, destination and project schedule.

Tell us about the application. Let’s start with the right questions.

DEVINSAN / PROJECT ENQUIRY

Tell us about your project.

Add your product and project details. Prepare an email message to share with our team.

This form does not send messages directly. Copy the prepared message or open it in your email app to send it.

DEVINSAN / PRODUCTION

Actual footage from Devinsan’s production process.